Alternative Plans: At least two different design alternatives will be prepared. Each alternative will be presented with 3D visuals and detailed drawings.
Material List: A detailed list of all materials used will be created.
BOQ Preparation: A Bill of Quantities (BOQ) will be prepared for each material.
Implementation Process:
Existing Site Measurements: Measurements of the existing site will be taken meticulously.
Site Management: Site management and oversight of all stages of construction will be ensured with our team.
Note: This text presents a general plan of the project. Changes in planning can be made according to the specific requirements of the project.